HSE Risk Monitoring Through Integrated HSE Inspection and Pre Use Inspection Program
Kata Kunci:
PHE WMO, PDCA, HSE Inspection, Pre Use Inspection, Interactive TrainingAbstrak
PT. Pertamina Hulu Energi West Madura Offshore (PHE WMO) is an Upstream Oil and Gas Company with main business is exploration and exploitation of oil and gas located in offshore west of Madura - East Java. One program to improve HSE (Health, Safety & Environment) risk management system performance in accordance with the PDCA (PlanDo-Check-Act) cycle is to conduct periodic risk monitoring. Risk monitoring will be used to improve the HSSE Risk Register that already created. PHE WMO developed Check and Act tools in the form of HSE Inspection and Pre Use Inspection for periodic Risk Monitoring. HSE Inspection is periodically work environment inspection system from the aspect of Health, Safety and Environment to identify hazard and unsafe condition in the work environment and take corrective action to ensure the working environment are in safe and healthy conditions. While Pre use Inspection is equipment inspection system that conduct before using the equipment to identify unsafe condition in the equipment and take corrective action to ensure the equipment is safe at the time of use. One of the strategies to accelerate the implementation of HSE Inspection and Pre Use Inspection system in PHE WMO are using integrated interactive HSE Inspection and Pre Use Inspection training for designated HSE inspection teams and equipment operators. This paper will present the implementation of Integrated HSE Inspection and Pre Use Inspection in PHE WMO and acceleration strategy by using interactive training material to improve performance in PHE WMO.