Decision-Making Process for Development of Oil Fields Based on Static and Production Data Analysis from Exploration Wells

Authors

  • Muhammad Ichsan Arshanda Chevron Pacific Indonesia
  • Endo Finaldhi Chevron Pacific Indonesia
  • Sayid Habibi Alkahfi Chevron Pacific Indonesia
  • Eric Whittet Bhark Chevron Pacific Indonesia

Abstract

Kokoh Field and Kelok Northeast (NE) Field are two recent discovery fields in the Central Sumatra Basin, Indonesia. Due to limited exploration well data and remote field locations which preclude additional exploration due to high capital expense, the decision to drill development wells requires management of key subsurface uncertainties that could result in marginally or uneconomic development investment in the case of low-side uncertainty outcomes. To manage this risk, the information from available exploration wells and surveillance data are identified to resolve subsurface uncertainties that have the greatest impact on development outcomes. Of particular value are production surveillance data from exploration wells including singlecompletion versus commingled production streams per well, reservoir pressure, fluid analysis, wellbore integrity and facilities flow assurance that enable characterization of development well performance forecasts and their uncertainty.

This paper describes the approach to, as well as the challenges encountered during, production surveillance from exploration wells in Kokoh and Kelok NE fields. Surveillance and analyses performed include extended singlewell production tests, downhole pressure and temperature monitoring, fluid analysis and fitfor-purpose reservoir simulation modeling for dynamic reservoir characterization. During production surveillance, several challenges required management including early water breakthrough, high wellhead pressure, high ESP motor temperature, intermittent pipeline flow and oil congealing, all of which jeopardized the collection of surveillance data. Analysis of the surveillance data set, together with investment efficiency analysis, resulted in the decision to drill a single development well in Kelok NE Field. The production outcome to date is within the forecast reliability range and, therefore, within the expected range of economic outcomes. 

Published

30-05-2023

Issue

Section

Articles